DALE HOLLOW DAM(戴尔霍洛大坝) 请概括这个大坝的情况,建于何年,谁建的,什么原因建的,在哪?What is DALE HOLLOW DAM?When was this created?Why?By whom?Where?请分别用 英文 和 中文 分别做答.

来源:学生作业帮助网 编辑:作业帮 时间:2024/05/04 03:44:28
DALE HOLLOW DAM(戴尔霍洛大坝) 请概括这个大坝的情况,建于何年,谁建的,什么原因建的,在哪?What is DALE HOLLOW DAM?When was this created?Why?By whom?Where?请分别用 英文 和 中文 分别做答.

DALE HOLLOW DAM(戴尔霍洛大坝) 请概括这个大坝的情况,建于何年,谁建的,什么原因建的,在哪?What is DALE HOLLOW DAM?When was this created?Why?By whom?Where?请分别用 英文 和 中文 分别做答.
DALE HOLLOW DAM(戴尔霍洛大坝) 请概括这个大坝的情况,建于何年,谁建的,什么原因建的,在哪?
What is DALE HOLLOW DAM?When was this created?Why?By whom?Where?
请分别用 英文 和 中文 分别做答.

DALE HOLLOW DAM(戴尔霍洛大坝) 请概括这个大坝的情况,建于何年,谁建的,什么原因建的,在哪?What is DALE HOLLOW DAM?When was this created?Why?By whom?Where?请分别用 英文 和 中文 分别做答.
Dale Hollow locate on The Dale Hollow Reservoir which lies mainly in northern Tennessee,where it covers portions of Clay,Pickett,and Overton Counties.Small arms of the lake also extend northward into the Kentucky counties of Cumberland and Clinton.The project consists of 27,700 acres (112 km²) of water and 24,842 acres (101 km²) of surrounding land.
Dale Hollow Dam and Lake was authorized by the Flood Control Act of 1938 and the River and Harbor Act of 1946.The project was completed by the United States Army Corps of Engineers in 1943,making the lake the oldest artificial lake in Kentucky.Hydroelectric power generating units were added in 1948,1949 and 1953.The project was designed by the Corps of Engineers and built under their supervision by private contractors.The hydroelectric generators of Dale Hollow Dam are used to supply power to the surrounding countryside.The dam,powerplant and reservoir are currently operated by the Nashville District of the Corps.
The lake takes its name from William Dale,a government surveyor and veteran of the War of 1812.Settling originally in Willow Grove,Mr.Dale bought his first 449 acres (1.8 km²) of land nearby in 1808.The farm eventually grew into a plantation known as Dale Hollow; he and his descendants lived there until the dam was started in 1942.The waters of the lake would ultimately cover both the farm and Willow Grove,“the town that drowned”.
戴尔霍洛大坝建在美国田纳西靠近Celina的Clay郡的Obey河上,戴尔霍洛大坝工程由1938年的控制洪涝法案授权通过,在1943年由美国陆军工兵部队建造完成,又分别在1948年、1949年、和1953年增建了水力发电站以利用水力能源,这项工程由陆军工兵设计并在私人承包商的监督下由陆军工程兵完成的.
至于原因,应该像三峡一样,出于防洪,进一步利用水能,一举两得!